IHS QUE$TOR 2019 Q3

General upgrades in QUE$TOR 2019 Q3
In response to feedback the following features have been implemented
in QUE$TOR 2019 Q3.
l Steam injection
l Drilling updates
l Electrically heat traced flowline (EHTF) enhancement
l Sulphur quantity in production facility
l Erosional velocity constant in regional technical databases
l Editable number and design capacity of dehydration trains
l Platform xmas trees included in Topsides weight
Steam injection
Estimation of onshore wells with thermal recovery is now possible.
CAPEX estimations are made for the steam transportation and
wellhead designs. The required demand on the OPEX can now be
directly determined from the wells.
Enhanced thermal recovery with steam injection can be enabled at the
field level or in individual wellpad or drilling components. This feature
builds on the steam generation equipment that was added in the
previous release where the equipment and OPEX demands to generate
the thermal recovery steam were added.
When steam injection is enabled in the Miscellaneous > Field level data
screen (Figure 6), this will add the steam injection equipment on all
drilling components in the project. This then cascades to the linked
wellpad group components and then any linked production facilities. So
these components will have the steam injection equipment added
automatically